Official project record

Laundromat project — 1601 W HUNTINGDON ST

1601 W HUNTINGDON ST, Philadelphia, PA, 19132-3946

Verified

What is this project?

FOR EXTERIOR ALTERATIONS (NEW ACCESSIBLE RAMP WITHIN PUBLIC RIGHT-OF-WAY) AND LEVEL III INTERIOR ALTERATIONS WITH A COMPLETE CHANGE IN USE & OCCUPANCY TO GROUP B LAUNDROMAT (REPAIR & MAINTENANCE OF CONSUMER GOODS) AT THE 1ST FLOOR WITH GROUP R-3 SINGLE-FAMILY DWELLING AT THE 2ND THROUGH 3RD FLOORS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AT THE BASEMENT AND 1ST FLOOR AND PER NFPA 13R AT THE 2ND THROUGH 3RD FLOORS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEE SR-2025-030680 FOR STREETS DEPT. APPROVAL. [AMENDMENT 6/17/2026 FOR LAYOUT CHANGES AT THE 1ST FLOOR (RELOCATION OF LAUNDROMAT EQUIPMENT) WITH ASSOCIATED STRUCTURAL REVISIONS AS PER APPROVED AMENDED PLANS. **A SEPARATE AMENDMENT TO SP-2025-001388 IS REQUIRED TO ADDRESS ANY CHANGES TO APPROVED EXCAVATION WORK IN THE BASEMENT.**]

Project status

The recorded lifecycle stage is Permitted. Dates and values below are shown only when present in the source records.

Project type
Remodel
Lifecycle stage
Permitted
Issue date
Oct 28, 2025

Why it matters to laundromat buyers

This project represents potential incoming laundromat supply in the Philadelphia, PA area.

Traceable source records

Official evidence

philadelphia permitsRecord CP-2025-004175

FOR EXTERIOR ALTERATIONS (NEW ACCESSIBLE RAMP WITHIN PUBLIC RIGHT-OF-WAY) AND LEVEL III INTERIOR ALTERATIONS WITH A COMPLETE CHANGE IN USE & OCCUPANCY TO GROUP B LAUNDROMAT (REPAIR & MAINTENANCE OF CONSUMER GOODS) AT THE 1ST FLOOR WITH GROUP R-3 SINGLE-FAMILY DWELLING AT THE 2ND THROUGH 3RD FLOORS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AT THE BASEMENT AND 1ST FLOOR AND PER NFPA 13R AT THE 2ND THROUGH 3RD FLOORS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEE SR-2025-030680 FOR STREETS DEPT. APPROVAL. [AMENDMENT 6/17/2026 FOR LAYOUT CHANGES AT THE 1ST FLOOR (RELOCATION OF LAUNDROMAT EQUIPMENT) WITH ASSOCIATED STRUCTURAL REVISIONS AS PER APPROVED AMENDED PLANS. **A SEPARATE AMENDMENT TO SP-2025-001388 IS REQUIRED TO ADDRESS ANY CHANGES TO APPROVED EXCAVATION WORK IN THE BASEMENT.**]

Event date: Oct 28, 2025 · Retrieved: Sep 24, 2026

Official record →