Property and lease
Model deposits, rent during construction, landlord work, term, renewal rights, permitted use and who pays for building-system improvements. A low base rent can still be expensive when utilities or repair obligations shift to the tenant.
Construction and utilities
Request site-specific estimates for plumbing, drains, sewer, water supply, electrical service, gas, ventilation, flooring and accessibility. Verify available capacity with utilities and authorities before treating a site as buildable.
Equipment and systems
Budget washers, dryers, payment systems, water heating, folding areas, security, signage and installation. Compare purchase and financing terms, warranties, maintenance and expected replacement cycles.
Opening and working capital
Include permits, design and professional fees, insurance, launch marketing, staffing, supplies, utility deposits and cash needed while usage builds. Keep a contingency for approved changes and unknown site conditions.
Texas budget case: an assumed Austin self-service store
Sources checked . This is a reproducible, partially priced scenario, not an industry average, a contractor bid or an estimate of the complete cost to open.
Assumptions, separate from observed prices
Assume 2,000 SF in Austin, 10 new WQD730 coin washers and 5 D735S natural-gas stack cabinets (10 dryer pockets). The uniform equipment mix is an arithmetic example, not a recommended store design. No site or equipment order has been secured.
Model 8,000 kWh, 30,000 gallons of water and 30,000 billed wastewater gallons per month. These are independent workload assumptions, not consumption forecasts from the machines. Assume a 1-inch meter, non-CAP billing and no voluntary Purple Choice. Utility service territory, meter adequacy and wastewater billing basis require confirmation.
Observed source inputs and their limits
- WebstaurantStore: WQD730 coin washer/base, 120V ↗
- Data date
- Publication date UNKNOWN; price observed Nov 7, 2026
- Geography
- US retailer; delivery to Texas not quoted
- Value / unit
- $9,999 per new 30 lb washer/base kit
- Validity / use
- Displayed price; special order, fleet availability and delivery date UNKNOWN. Tax, site installation and utility work excluded.
- WebstaurantStore: D735S gas stack dryer, 120V ↗
- Data date
- Publication date UNKNOWN; price observed Nov 7, 2026
- Geography
- US retailer; delivery to Texas not quoted
- Value / unit
- $11,599 per new cabinet with two 35 lb pockets
- Validity / use
- Displayed price, not a fleet quote. Special-order timing, installation, gas connections, venting, payment configuration and tax require confirmation.
- EIA Electric Power Monthly, table 5.6.A ↗
- Data date
- August 2026 observation
- Geography
- Texas commercial sector
- Value / unit
- 8.96 US cents/kWh ($0.0896/kWh)
- Validity / use
- Historical statewide revenue/sales average, not an Austin Energy tariff or a store quote. The linked monthly table changes; obtain the site's actual tariff and bill components.
- Austin Water: FY2026–27 commercial schedule (PDF) ↗
- Data date
- Effective Oct 1, 2026
- Geography
- Austin Water retail commercial service
- Value / unit
- 1-inch water fixed $42.28/month; water $6.03 off-peak or $6.87 peak per 1,000 gal, plus $0.50; wastewater fixed $11.26/month plus $12.42 per 1,000 billed gal, plus $0.45
- Validity / use
- Current published schedule. Non-CAP example; no voluntary Purple Choice. Water additions: $0.05 reserve + $0.30 community + $0.15 GoPurple. Wastewater additions: $0.30 + $0.15. Off-peak Nov–Jun bills; peak Jul–Oct. Wastewater billing volume and meter capacity need utility confirmation.
- Texas Gas Service: small-commercial schedule 20 (PDF) ↗
- Data date
- Meter reads from Jun 24, 2026
- Geography
- TGS incorporated service areas; site eligibility unverified
- Value / unit
- $88.69/meter/month including IRA; $0.49348/Ccf service component
- Validity / use
- Not an all-in gas rate. Cost of gas, riders, taxes, consumption and rate class UNKNOWN. Small-class assignment uses annual normalized volume below 3,001 Ccf; this store may need schedule 25. No gas bill is included below.
- RESOLUT RE: 6507 Jester Blvd retail brochure (PDF) ↗
- Data date
- Quote date UNKNOWN; brochure inspected Nov 7, 2026
- Geography
- One Austin retail property, not a Texas average
- Value / unit
- $25/SF/year base + $10/SF/year landlord-estimated NNN; 2,000 SF retail option shown
- Validity / use
- Published asking terms only. Current availability UNKNOWN: listing services disagree; other brochure versions have a different NNN estimate. Use as a rent scenario, not a recommended laundromat site. Obtain landlord consent, capacity checks and a current written offer.
- BLS OEWS: Austin-Round Rock, SOC 51-6011 ↗
- Data date
- May 2023, historical
- Geography
- 2023 Austin-Round Rock metro, all surveyed industries
- Value / unit
- $14.42/hour historical median for laundry and dry-cleaning workers
- Validity / use
- Not a current hiring quote or total employer cost. This occupation includes employers other than self-service laundromats. Current wage, benefits, payroll taxes and owner labor UNKNOWN; excluded from the priced subtotal.
- City of Austin: commercial fee schedule (PDF), page 1 ↗
- Data date
- Effective Oct 1, 2026; updated Oct 12
- Geography
- City of Austin commercial applications
- Value / unit
- $145.89 application processing fee
- Validity / use
- One fee line only, not the full permit cost. Review, building/trade permits, fire, utility impact/meter fees and other approvals depend on the actual site and scope; total UNKNOWN.
Recalculate the priced part
Scroll the tables horizontally on a narrow screen. USD throughout. Products are shown at public item prices, not discounted fleet prices; the rent reference is a broker asking-term scenario with unconfirmed availability.
| Item | Calculation | Scenario amount |
|---|---|---|
| Washers source | 10 × $9,999 | $99,990.00 |
| Stack dryer cabinets source | 5 × $11,599; two pockets per cabinet | $57,995.00 |
| Equipment subtotal only | Washers + dryer cabinets | $157,985.00 |
| Application processing only source | One application × $145.89; other fees unpriced | $145.89 |
| Preopening rent assumption | 3 months × 2,000 SF × ($25 + $10) / 12 | $17,500.00 |
| Limited post-opening reserve assumption | 3 months × selected monthly items below; separate period from preopening rent | $21,557.02 |
| Priced-scenario subtotal | Equipment + processing + preopening rent + limited reserve; equipment subtotal counted once | $197,187.91 |
| Complete startup / required funding | Priced items + every missing quote, taxes and a site-specific contingency | UNKNOWN |
| Item | Calculation / basis | Per month |
|---|---|---|
| Rent + estimated NNN source | 2,000 × ($25 + $10) / 12 | $5,833.33 |
| Electricity benchmark source | 8,000 × $0.0896; historical Texas average | $716.80 |
| Water, off-peak source | $42.28 + 30 × ($6.03 + $0.50) | $238.18 |
| Wastewater source | $11.26 + 30 × ($12.42 + $0.45); equal billed volume assumed | $397.36 |
| Selected monthly subtotal | Sum of the four lines above; retain unrounded amounts until the final display | $7,185.67 |
| Gas, labor and other operating costs | Actual gas tariff/usage, wages, employer burden, insurance, repairs, supplies, fees and other bills still needed | UNKNOWN |
Sensitivity: change one assumption at a time
- Another washer adds $9,999 to item cost; another stack cabinet adds $11,599, before tax and site work.
- A $5/SF/year increase in base rent or NNN adds $833.33 per month. One more preopening month adds $5,833.33 of rent alone.
- Another 2,000 kWh adds $179.20 at the EIA benchmark; the actual tariff can behave differently.
- Another 10,000 gallons of both water and billed wastewater adds $194.00 off-peak. Peak water billing adds $25.20 at the base volume.
- A 2-inch instead of 1-inch water meter raises the published fixed water charge by $142.04 per month, before any installation or impact fee. Neither size is certified adequate here.
- If staffing is assumed at 160 paid hours/month, each $1/hour wage change adds $160/month before employer costs; a current hiring rate is still UNKNOWN.
Quotes needed before this becomes a usable opening budget
UNKNOWN does not mean $0. Obtain a landlord offer and permitted-use approval; engineer/contractor bids for drains, water, gas, electric capacity, foundations and exhaust; utility meter/impact/connection charges; tax and delivered/installed equipment bids; payment systems and water heating; all review, trade, fire and accessibility requirements; insurance, deposits, payroll, opening expenses and contingency. Ask suppliers to confirm quantities, warranty and commissioning, not just an item price.
A lender-ready total and cash reserve remain UNKNOWN until those items are costed. Use this case to identify and compare quotes, not to assume the listed retail space can legally or physically support a laundromat. Recheck every source before signing or ordering.
Compare candidate locations
Use the same cost categories for each site, then add local competition, households, access and incoming projects to the decision. This page does not quote a national startup price because our data does not support one.
Research a market →