FOR LEVEL II INTERIOR ALTERATIONS TO CONSOLIDATE TWO (2) EXISTING SHOPPING CENTER TENANT SPACES (UNITS #30 AND #31) INTO ONE (1) TENANT SPACE AND FOR A FIT-OUT OF THE CONSOLIDATED SPACE WITH A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO GROUP B MAINTENANCE AND REPAIR OF CONSUMER GOODS (LAUNDROMAT). EXISTING BUILDING IS NOT SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FUEL GAS WORK. [AMENDMENT 3/6/2026 FOR APPROVAL OF DEMOLITION SHEET A-1.1 AND FOR TEMPORARY SHORING AS PER AMENDED PLANS.] [AMENDMENT 5/4/2026 FOR CHANGES TO INTERIOR FLOOR SLAB CONSTRUCTION AS PER APPROVED AMENDED PLANS.]
Official record →Official project record
Laundromat project — 3200 RED LION RD
3200 RED LION RD, Philadelphia, PA, 19114-1109
What is this project?
FOR LEVEL II INTERIOR ALTERATIONS TO CONSOLIDATE TWO (2) EXISTING SHOPPING CENTER TENANT SPACES (UNITS #30 AND #31) INTO ONE (1) TENANT SPACE AND FOR A FIT-OUT OF THE CONSOLIDATED SPACE WITH A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO GROUP B MAINTENANCE AND REPAIR OF CONSUMER GOODS (LAUNDROMAT). EXISTING BUILDING IS NOT SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FUEL GAS WORK. [AMENDMENT 3/6/2026 FOR APPROVAL OF DEMOLITION SHEET A-1.1 AND FOR TEMPORARY SHORING AS PER AMENDED PLANS.] [AMENDMENT 5/4/2026 FOR CHANGES TO INTERIOR FLOOR SLAB CONSTRUCTION AS PER APPROVED AMENDED PLANS.]
Project status
The recorded lifecycle stage is Permitted. Dates and values below are shown only when present in the source records.
- Project type
- Tenant Buildout
- Lifecycle stage
- Permitted
- Issue date
- Jan 28, 2026
Why it matters to laundromat buyers
This project represents potential incoming laundromat supply in the Philadelphia, PA area.
Traceable source records